The Cut and Cover concourse structure of Farabi State Hospital Station is located between Cevahir Street and Karlı Street. There will be an exit to Farabi State Hospital with the Pedestrian Tunnel connected to the concourse structure. The Platform Tunnels, Stair Tunnels and the Pedestrian Tunnel are constructed with the New Austrian Tunnelling Method (NATM). The depth of the station is 37 m and the Construction Area is 8.167 m².