OSB

OSB

It is being built with the New Austrian Tunnelling Method (NATM). A parking and stop area is also planned for Organized Industrial Zone shuttles and circuit bus routes. The depth of the station is 50 m and the Construction Area is 6,668 m².

TECHNICAL INFORMATION
GALLERY
Call Center

ALO 123

© 2022 Ministry of Transport All rights reserved.