GDM By Numbers

GDM By Numbers


Outline Features
90 km/h
Design Speed
80 km/h
Operating Speed
330.000
Passenger/Day
Passenger Capacity
22 Dk/One Direction
Project Route Travel Time
6,83 km
TBM Main Line Tunnel Length
20,52 km
Natm Main Line Tunnel Length
6 Piece
Tunnel Type Station
5 Piece
On-Off Type Station

Warehouse Area
17 Vehicle
Train Parking Area
45 Piece
Scissors
Total Excavation
Amount
916.664 m3